Vermont Public Service Board
January 2007 Orders and Decisions
ORDERS ENTERED JANUARY 4, 2007
7228 ORDER
APPROVING INTERCONNECTION AGREEMENT between Verizon New England Inc.,
d/b/a Verizon Vermont, and CommPartners, LLC
WordPerfect
AdobeAcrobat
CPG #NM-303 FINDINGS, ORDER, AND CERTIFICATE OF PUBLIC
GOOD APPROVING APPLICATION of Robert and Pamela Currier for an
interconnected net metered wind turbine
CPG #NM-305 FINDINGS,
ORDER, AND CERTIFICATE OF PUBLIC GOOD APPROVING APPLICATION of Steven
and Lynn Wing for an interconnected net metered photovoltaic electrical
power system
CPG #NM-309 FINDINGS,
ORDER, AND CERTIFICATE OF PUBLIC GOOD APPROVING APPLICATION of George
Heller for an interconnected net metered photovoltaic electrical power
system
ORDER ENTERED JANUARY 9, 2007
7237 PREHEARING
CONFERENCE MEMORANDUM AND NOTICE OF STATUS CONFERENCE In Re:
Petition of Five Ratepayers requesting a change in service territory
from Vermont Electric Cooperative, Inc., to Town of Stowe Electric
Department WordPerfect
AdobeAcrobat
CONTRACT
ENTERED JANUARY 9, 2007
SC 495 (Amendment No. 1) GAS Special Contract approval
between Vermont Gas Systems, Inc., and Rock-Tenn Company, Mill
Division, Inc.
ORDERS
ENTERED JANUARY 11, 2007
6860 ORDER RE: APPROVAL OF RELOCATION OF VERMONT MARBLE
46 KV LINE. Petitions of Vermont Electric Power Company, Inc.
(VELCO), Vermont Transco, LLC, and Green Mountain Power Corporation
(GMP) for a certificate of public good, pursuant to 30 V.S.A. Section
248, authorizing VELCO to construct the so-called Northwest Vermont
Reliability Project, said project to include: (1) upgrades at 12
existing VELCO and GMP substations located in Charlotte, Essex,
Hartford, New Haven, North Ferrisburgh, Poultney, Shelburne, South
Burlington, Vergennes, West Rutland, Williamstown, and Williston,
Vermont; (2) the construction of a new 345 kV transmission line from
West Rutland to New Haven; (3) the reconstruction of a portion of a
34.5 kV and 46 kV transmission line from New Haven to South Burlington;
and (4) the reconductoring of a 115 kV transmission line from
Williamstown to Barre, Vermont WordPerfect
AdobeAcrobat
7035 ORDER RE: GMP
RECLAMATION REPORT. Joint Petition of Green Mountain Power
Corporation and Vermont Electric Cooperative, Inc. for a certificate of
public good, pursuant to 30 V.S.A. Section 248, authorizing: (1)
the construction of a new joint substation with a transformer operating
at 34.5/12.5 kV to be located south of Governor Peck Road on the north
side of I-89; (2) the removal of two existing substations; and (3) the
reconfiguration of the adjacent transmission and distribution lines to
be served by the joint substation, all in Richmond, Vermont
WordPerfect
AdobeAcrobat
7230 ORDER APPROVING
AMENDMENT NO. 1 TO INTERCONNECTION AGREEMENT between Verizon Vermont
New England, Inc., d/b/a Verizon Vermont, and XO Communications
Services, Inc. WordPerfect
AdobeAcrobat
7231 ORDER APPROVING
AMENDMENT NO. 1 TO INTERCONNECTION AGREEMENT between Verizon New
England, Inc., d/b/a Verizon Vermont, and SBC Long Distance, LLC, d/b/a
SBC Long Distance, d/b/a AT&T Long Distance
WordPerfect
AdobeAcrobat
ORDER
ENTERED JANUARY 12, 2007
7162 ORDER RE ACCOUNTING ORDER. Board Investigation
into a Request for an Accounting Order by Central Vermont Public
Service Corporation WordPerfect
AdobeAcrobat
ORDERS
ENTERED JANUARY 18, 2007
6860 ORDER RE:
REQUEST TO JOIN CENTRAL VERMONT PUBLIC SERVICE CORPORATION AS
CO-PETITIONER. Petitions of Vermont Electric Power Company, Inc.
(VELCO), Vermont Transco, LLC, and Green Mountain Power Corporation
(GMP) for a certificate of public good, pursuant to 30 V.S.A. Section
248, authorizing VELCO to construct the so-called Northwest Vermont
Reliability Project, said project to include: (1) upgrades at 12
existing VELCO and GMP substations located in Charlotte, Essex,
Hartford, New Haven, North Ferrisburgh, Poultney, Shelburne, South
Burlington, Vergennes, West Rutland, Williamstown, and Williston,
Vermont; (2) the construction of a new 345 kV transmission line from
West Rutland to New Haven; (3) the reconstruction of a portion of a
34.5 kV and 46 kV transmission line from New Haven to South Burlington;
and (4) the reconductoring of a 115 kV transmission line from
Williamstown to Barre, Vermont WordPerfect
AdobeAcrobat
7215 STATUS
CONFERENCE MEMORANDUM; PROCEDURAL ORDER In Re: Tariff filing of
Vermont Gas Systems, Inc. requesting revisions to its Transportation
and Balancing Service Rate Schedule, and the introduction of an
Interruptible Sales Service Rate Schedule, to take effect October 1,
2006 WordPerfect
AdobeAcrobat
7251 ORDER
APPROVING SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN.
Investigation into the Town of Hardwick Electric Department's proposed
Successor Service Quality and Reliability Performance, Monitoring and
Reporting Plan WordPerfect
AdobeAcrobat
7252 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN. Investigation
into the Village of Jacksonville Electric Company's proposed Successor
Service Quality and Reliability Performance, Monitoring and Reporting
Plan WordPerfect
AdobeAcrobat
7253 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN. Investigation
into the Town of Readsboro Electric Light Department's proposed
Successor Service Quality and Reliability Performance, Monitoring and
Reporting Plan WordPerfect
AdobeAcrobat
CPG 838-CR FINDINGS, ORDER, AND CERTIFICATE OF PUBLIC
GOOD APPROVING PETITION of Topsham Communications, LLC to operate as a
provider of telecommunications services in Vermont, including service
to the local exchange
CPG 843-CM FINDINGS,
ORDER, AND CERTIFICATE OF PUBLIC GOOD APPROVING PETITION of NOSVA
Limited Partnership for a certificate of public good to operate as a
provider of commercial mobile radio services in Vermont
CPG 844-R FINDINGS,
ORDER, AND CERTIFICATE OF PUBLIC GOOD APPROVING PETITION of Multiline
Long Distance, Inc. for a certificate of public good to operate as a
provider of telecommunications services in Vermont
ORDER
ENTERED JANUARY 19, 2007
7121 ORDER RE: REQUEST FOR CLARIFICATION. Amended
Petition of Vermont Electric Power Company, Inc. for authority to
condemn easement rights in property interests of The Harley A. Grice
Revocable Trust, Harley A. Grice, Trustee; Wendy G. Butler, Penny E.
Curler, Successor Trustees; and Harley A. Grice, Wendy G. Butler, Penn
E. Curler and Heather H. Grice, as Beneficiaries; and the Marilyn M.
Grice Revocable Trust, Wendy G. Butler, Penny E. Curler, and Harley A.
Grice, Trustees; and Harley A. Grice, Wendy G. Butler, Penny E. Curler,
and Heather H. Grice, as Beneficiaries, for the purpose of constructing
the 345 kV transmission line portion of the so-called Northwest
Reliability Project
WordPerfect
AdobeAcrobat
ORDERS
ENTERED JANUARY 22, 2007
7254 ORDER
APPROVING SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the Village
of Enosburg Falls Water and Light Department
WordPerfect
AdobeAcrobat
7255 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the
Village of Northfield Electric Department
WordPerfect
AdobeAcrobat
7256 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the Barton Village
Inc. Electric Department WordPerfect
AdobeAcrobat
7257 ORDER
APPROVING SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the Swanton
Village Inc. Electric Department WordPerfect
AdobeAcrobat
7258 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the
Village of Orleans Electric Department WordPerfect
AdobeAcrobat
7259 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the
Village of Johnson Water & Light Department
WordPerfect
AdobeAcrobat
7260 ORDER
APPROVING SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the
Village of Lyndonville Electric Department
WordPerfect
AdobeAcrobat
7261 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND
RELIABILITY PLAN of the Village of Ludlow Electric Light
Department WordPerfect
AdobeAcrobat
7262 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the Town of Stowe
Electric Department WordPerfect
AdobeAcrobat
ORDERS
ENTERED JANUARY 25, 2007
7095 PROCEDURAL
ORDER RE: SCHEDULE in re: Investigation into Central Vermont Public
Service Corporation's Class Cost of Service Study and Rate Design
Proposals WordPerfect
AdobeAcrobat
7233 ORDER APPROVING
AMENDMENT NO. 1 TO INTERCONNECTION
AGREEMENT between Verizon New England Inc., d/b/a Verizon Vermont, and
A.R.C. Networks, Inc., d/b/a InfoHighway Communications
WordPerfect
AdobeAcrobat
7234 ORDER APPROVING
AMENDMENT NO. 3 TO INTERCONNECTION AGREEMENT between Verizon New
England Inc., d/b/a Verizon Vermont, and Sprint Communications Company,
L.P. WordPerfect
AdobeAcrobat
7264 ORDER APPROVING
SUCCESSOR SERVICE QUALITY AND RELIABILITY PLAN of the Village of Hyde
Park Electric Department WordPerfect
AdobeAcrobat
ORDER
ENTERED JANUARY 30, 2007
7246 PREHEARING CONFERENCE MEMORANDUM. Petition of
Central Vermont Public Service Corporation for a certificate of public
good, pursuant to 30 V.S.A. Section 248, authorizing the construction
of a 115/46 kV electrical substation, including the installation of
synchronous condensers and related equipment, at the intersection of
Kendall Farm Road and Blackberry Ridge Road in the Town of Winhall,
Vermont WordPerfect
AdobeAcrobat
ORDERS
ENTERED JANUARY 31, 2007
7085 SCHEDULING ORDER In Re: Petitions of Town of
Thetford, Village of Woodstock, City of St. Albans and Town of Rutland,
Vermont, requesting an investigation into the terms and conditions of
street light services offered by Central Vermont Public Service
Corporation WordPerfect
AdobeAcrobat
7236 FINAL ORDER AND
CERTIFICATE OF PUBLIC GOOD In Re: Petition of Northern Power
Systems, Inc. for a Certificate of Public Good pursuant to 30 V.S.A.
§ 248(j) authorizing the construction of an energy generation and
distribution network known as the MadGrid Project in Waitsfield,
Vermont WordPerfect
AdobeAcrobat
WordPerfect
AdobeAcrobat
Direct further inquiries or requests to: psb.clerk@state.vt.us